Dredging Services

Seabird Integrated Services Limited is a subsidiary of Seabird Dredging & Construction Limited, and have executed several Dredging projects within the Niger Delta region, South South Nigeria, some of the projects includes:


Sand filling of Niger Delta University permanient Site; Wilberforce Island, Ammasoma – Bayelsa State. Over 200 hecters of Swamp area reclaimed and Sandfilled for infrastructure development by the Bayelsa State Government the school. Seabird Dredging and Konaliz Investment Limited, one of our local partners was fully involved in this project from site preparation to completion. This project brought out our best professional practice as it was executed at the begaining of the Niger Delta Militancy and we had to deal with hostile host community and youths restiveness in course of our work.




Masters Energy Offloading Jetty; Oil & Gas City, Rumuolumini Port Harcourt Rivers State.Equipment Partner Fiddil Limited In 20011 Seabird Integrated Services with its executed the expansion and deepening of the Agip Creek leading to Masters Energy Tank Farm. Before the project was awarded, the creek has an average draft of 4meters dept and can only take 10,000tons vessels. Now we embacked on the sweeping project and increased the creek draft to 10 meters dept and the facility can comfortable take 20,000 tons vessels and two vessels at a time.



Setraco Nigeria Limited, Turu-beni- Ogobiri Link Road Sand filling – Bayelsa State In 2007, Setraco Nigeria Limited a road construction giant awarded Seabird dredging the contract to dredge sharp sand for the sand filling of the Turu-beni – Ogobiri link road awarded them by the Bayelsa State Government. Seabird dredged over 500,000cubics meters of sharp with a 26inches cutter suction dredge in a record time of three months.




RiviGo Nigeria Limited; Unity Road (Ogoni-Adoni-Opobo Link Road) Rivers State In 2008, Rivigo Nigeria Limited through Masta Services Limited awarded Seabird Dredging Contract to Stockpiled 200,000 Cubic Meters of Sharp sand, for road sand filling purposes. This project was executed within 10weeks using a 16inch Cutter suction dredge.